Dan's portable solar generator is powering the job site. |
Laying out the front (south) wall over the cistern/porch. |
First framed wall goes up- east side. |
First floor framed. Hurricane ties in place to secure second floor. |
South wall framed. |
Header bolted in place on back wall to catch 2nd floor joists. |
Kitchen area. |
Hurricane ties under sill plate, connecting every stud. |
No comments:
Post a Comment