HOLIDAY SIDING

A few photos from Dan this week showing the roof complete and the first of the pickled siding going up.  Also got the insurance adjuster over there to appraise the place in terms that a carrier can understand.  A step needed before we could get a quote on a policy.
Looking up from the west side.  The plastic green containers are the aerobic septic system.  You can also see where water from the gutters drains into the cistern under the porch.

The south wall is all sided and trimmed out for the three large doors that will open out to the porch.
Just starting siding on the east side.  Temporary 2nd floor gutter drains run into the first floor gutters to make sure we're getting whatever rain falls until more permanent (and discrete) drains can be installed that will feed directly into the cistern.
North side perspective.  Roofing and gutters finished.  Siding to come.
Samples of 316 stainless steel hinges for all doors and shutters.  Went with the larger 2.5 " version.  Might have been cheaper just to buy windows.