Figuring out the shutter design. Heidi had drawn an X-framed shutter but Dan offered up a simpler diagonal... then the X. We are sticking with the X. Interior framing is moving forward, Tile has been bought from Home Depot and shipped to FL to be shipped to STT to be trucked to the marina to be brought over in Dan's boat (Patches or Sea Biscuit) to be hauled up the hill to Lovangalow. Steady as we go.
 |
Final shutter design. Not yet painted. |
 |
First option- simpler diagonal. Dismissed. |
 |
Progress with upstairs bedroom framing. |
 |
Floor tile for the downstairs. Wondering how many pieces it will show up in by the time it reaches Lovango. |
No comments:
Post a Comment