Sailing vacation down in the US/BVI gave us the chance to stop by the site and review things with both Dan (contractor/neighbor) and Heidi (architect). A few tweaks were made in a plan that seems to (finally) be settling. Progress on forms for slab and back wall are slow but steady. Dan is hoping to have the complete structure framed and closed up by the time he goes on vacation for month or more beginning July 21. I write this down to have a reference.
 |
Welcoming Committee chair and co-chair Olive Oyl (Great Dane) and Eeyore (Bassette Hound) hold fort in the beach shack. |
 |
Forms for 12' concrete wall with rebar and plumbing almost all installed. Front forms are next and then ready to pour. Block out on back wall is for door outside from upstairs bathroom to outdoor shower. Washer hook-up is below that. |
 |
Family reviews prints with Dan and Heidi. |
 |
Plan has kitchen/living/dining/bath/master bedroom downstairs and three small bedrooms and a bath upstairs. Both showers are connected to bathrooms but outside to save space and take advantage of the climate. |
No comments:
Post a Comment