Monday, May 4, 2015

STILL STILL PREPPING FOR SLAB

... but getting really close!  Alot of work forming the 12' back wall and laying in both the reinforcing steel and plumbing that will run through floor and back wall.  And building the scaffolding that will facilitate the pour.
Pano shot from the cistern looking to the 12' back wall.  Mechanical room (batteries and pump) back left, laundry room center, and storage back right.  Lots of rebar!  The shed in the background is on Dan's property and the cottage to the right is Capt Phil's.

The back wall is being laid back 1.5" over the 12' height to try to balance pressures from the bank.

Looking down on the floor.  The dug out spot is a footing to support a carrying post.

Impressive array of scaffolding to provide access for folks to handle the concrete.

Shot from the top of the driveway.  St Thomas in the back ground.

No comments: